11 October 2009

2nd Floor column (Lot PT2627) and 2nd Floor beam and slab (Lot PT2628) concreted and 2nd Floor column (Lot PT2628) ready for concreting

View from Front Left. Crane on standby to lift
concrete to 2nd. Floor.

View from Front Right. Column formwork to 2nd Floor
(Lot PT2628) already in place together with reinforcement

Close-up view. 2nd Floor beam and slab (Lot PT2628)
already concreted and 2nd Floor column (Lot PT2628)
formwork and rebar fixed in place


Another close-up view. 2nd Floor beam and slab
(Lot PT2628) concreted and 2nd Floor column
(Lot PT2628) formwork and reinforcement already fixed

Another view. Column formwork erected

2nd Floor column (Lot PT 2627) already concreted
and formwork already stripped
View from Front Left - 2nd. Floor column (Lot PT2627)
already concreted and formwork already stripped