29 September 2009

Ground Floor Staircase (Both Lots), 1st Floor Column (Lot PT2628) and 2nd Floor Beam and Slab (PT2627) all concreted

Ground Floor Staircse finished concreting


Ground Floor Staircse finished concreting
(Another view)

Concreting of 2nd Floor Beam and Slab

Concreting of 1st. Floor column (close-up)

Concreting of 1st. Floor column

28 September 2009

View from the 2nd Floor

View of the Front

View of the Right Side (1)

View of the Right Side (2)

View of the Right Side (3)

View of the Back

View of the Left Side (1)

View of the Left Side (2)

View of the Left Side (3)

Ground Floor Staircase formwork in progress

Formwork under cosntruction


Another view of staircase formwork

1st. Floor column (Lot PT 2628) and 2nd. Floor beam and slab (Lot PT 2627) ready for concreting

View from Front. Reinforcement laid


View from Front. Reinforcement laid


View from Front (Middle). Reinforcement laid


View from Back. Reinforcement laid


View from Back. Reinforcement laid

17 September 2009

12 September 2009

10 September 2009

05 September 2009

1st. Floor column (Lot PT 2627) and 1st. Floor beam (Lot PT 2628) concreted

View from Front Left. Concreting of
column in progress

Concreting of column at the back

Concreting of beam and slab in progress

Concreting of beam and slab in progress

Concreting of beam and slab completed
(Total of 27m3 of concrete laid)

Concreting of beam and slab completed

04 September 2009

1st Floor column (Lot PT2627) and 1st Floor beam and slab (Lot PT2628) ready for concreting




Laying of beam reinforcement completed
and slab reinforcement in progress

Laying of beam reinforcement completed
and slab reinforcement in progress

View from Front Right - 1st. Floor beam
formwork in progress
View from Right - 1st. Foor beam
formwork completed
View from Right - 1st. Foor beam
formwork completed

Reinforcement to 1st Floor slab completed
and ready for concreting

Reinforcement to 1st Floor slab completed
and ready for concreting

Reinforcement to 1st Floor slab completed
and ready for concreting

Reinforcement to 1st Floor slab completed
and ready for concreting

View fron Back Right - Formwork for 1st Floor
beam and slab ready to receive concrete