26 August 2009

1st Floor ready for concreting for Lot PT2627

View from front. Reinforcement and electrical
pcv conduit pipe in place


View from front. Reinforcement and electrical
pcv conduit pipe in place

View from back. Reinforcement and electrical
pcv conduit pipe in place

View showing the airwell at the back

View showing the staircase opening

No comments:

Post a Comment