27 August 2009

1st Floor concreted for Lot PT2627

Concreting commence - View from Front Right

Concreting in progress

Concreting in progress

Concreting completed - various part of floor

Concreting completed - various part of floor

Concreting completed - various part of floor

Concreting completed - beam at the back

26 August 2009

1st Floor ready for concreting for Lot PT2627

View from front. Reinforcement and electrical
pcv conduit pipe in place


View from front. Reinforcement and electrical
pcv conduit pipe in place

View from back. Reinforcement and electrical
pcv conduit pipe in place

View showing the airwell at the back

View showing the staircase opening

23 August 2009

1st Floor formwork and steel reinforcement for beam completed for 1 unit

View from Front Left


Close -up of 1st. Floor formwork and beam reinforcement

Close -up of 1st. Floor formwork and beam reinforcement

Close -up of 1st. Floor formwork and beam reinforcement


Close -up of 1st. Floor formwork and beam reinforcement


Close -up of 1st. Floor formwork and beam reinforcement

19 August 2009

Ground Floor Column completed and 1st Floor Beam Formwork in progress

View from front Left


Close-up view


View from Front Right


Close-up view


Close-up view

Close-up view


15 August 2009

Ground Floor Column partly completed

View from Front Left


Columns at the back ready for concreting


Columns in front already concreted
and formwork removed

13 August 2009

Concreting to Ground Floor column in progress

Concreting to ground floor columns - completed
20 Nos. View fron Front Right


Concreting ground floor column


Concreting ground floor column - close-up view

12 August 2009

Ground Floor Column in progress

View from Front Right


View from Front Left


Formwork with reinforcement already put in place
Add Image

10 August 2009

Concreting to Ground Floor completed

Concreting about to begin. View from Front Right


Concreting in progress


Concreting in progress

Concreting completed


Concreting completed - View from Front left


Concreting completed.
Concreting completed. a total of 93 m3 poured


Fabricating reinforcement for
Ground Floor columns


Timber props for 1st Floor Beams already
made and waiting to be placed in position.

09 August 2009

Waste pipes laid and Ground Floor ready for concreting

Ground Floor ready for concreting
- Front Left View


Reinforcement and waste pipe to bath
in place - both lots

Reinforcement and waste pipe to bath in place

All reinforcement in place. Waste pipe to
kitchen seen in background


Waste pipe and gully trap in place