25 November 2009

Flood around site

Earth drains flooded

Access road flooded

Brickwork in progress - up to 3rd floor, Internal plastering - just started on Ground Floor, Electrical wiring in Progress

View from front Right

View from Front Left

View of front


View of Bedroom 1 and Store (Lot PT 2628).
Vent holes provided on wall

Plastering to Bedroom 1 (Lot PT2628) . Vent holes
also provided at wall separating store

Plastering in progress to Foyer (Lot PT 2628)

15 November 2009

Concreting to Roof Beam (Lot PT 2628) completed, Brickwork to Ground Foor completed and Brickwork to 1st. Floor in progress

View fron Front Right

View From Front Left

Access road flooded during the recent heavy downpour

Access road flooded during the recent heavy downpour

Bricks for 2nd Floor unloaded

09 November 2009

Concreting to Roof Beam (Lot PT 2627) completed and Brickwork to Ground Floor 75% completed

Concreting to roof beam (Lot PT 2627)

View from Front Left

Front View (Lot PT 2628)


Bath (Lot PT 2628)

Bedroom 1 and Store (Lot PT 2627)

Living/Dining (Lot PT2627)

Looking into kitchen (Lot PT2628)

Living/Dining (Lot PT2628)
Side Wall (Lot PT 2627)

03 November 2009

Formwork to Roof Beam (Lot PT2627) & Brickwork to Ground Floor in progress


View from Front Right


View from Front Left


Close-up Front View Ground Floor

01 November 2009

Formwork to Roof Beam (Lot PT2627) in progress & Brickwork to Ground Floor in progress

View from Front Right


View from Front Left


Timber door frames and cement air bricks



Close up Front Left


Close-up Front


Ground Floor Lot PT2627


Close-up Front Ground Floor - View from right side


View of Ground Floor - towards kitchen wall

Ground Floor room walls in progress (Lot PT2628)


Ground Floor room walls in progress (Lot PT2627)